看天堂-看特级毛片-看特级大黄一片-看全色黄一级毛片-看全色黄大色黄女视频-看全色黄大色黄大片视频

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
News
Hot products

Service Hotline

0755-29727486 0755-83734215 0755-83734236
Industry news

Where are you now:Home >> News >> Industry news
What problems need to be considered in PCBA processing?
Time:2023-11-23 Read: 1730

What issues need to be considered during PCBA processing?

1. Design of single board transmission and positioning elements for automated consumption lines


For automated production line assembly, PCBA must have the ability to transmit edges and optical positioning symbols, which is a prerequisite for production.


2. PCBA processing and assembly process design


The component design structure of the components on the front and back of the PCBA determines the process methods and methods during assembly.


3. Component planning and design


The position, direction and spacing design of components on the assembly surface. The design of components depends on the welding method used, and each welding method has specific requirements for the placement, direction and spacing of components.


4. Assembly process design


For the design of welding pass-through rate, through the matching design of pads, solder masks and stencils, the quantitative and fixed-point stable distribution of solder paste is completed; through the design of planning and wiring, the simultaneous melting and solidification of all solder joints in a single package is completed; Reasonable connection design of holes, 75% tin penetration rate, etc., these design purposes are to improve the welding yield.


Matters needing attention in PCBA processing and welding


1. Warehouse management personnel should wear anti-static gloves when sending materials and testing IQC, and use the instrument to be firmly grounded, and the work surface should be covered with anti-static rubber pads in advance.


2. During the operation, use an anti-static work surface, and at the same time use an anti-static container to hold components and semi-waste products. Some welding equipment can be grounded, and the electric soldering iron must be of anti-static type. All equipment must be tested before use.


3. When the PCBA is processed through the furnace, because the pins of the plug-in components are scoured by the tin flow, some plug-in components will be inclined after being welded in the furnace, causing the component body to exceed the silk screen frame. Therefore, the repair welding personnel after the tin furnace are requested to Abort proper correction.


4. When soldering horns and batteries, PCBA should pay attention that the solder joints should not be too much tin, and should not cause short circuits or scattered surrounding components.


5. The PCBA substrate needs to be placed uniformly, and the bare boards cannot be stacked directly. For stacking, it needs to be packed in electrostatic bags.


Precautions for PCBA processing finished product assembly


1. The whole machine without shell uses anti-static packaging bags


Regularly inspect anti-static tools, devices and materials to ensure that the working conditions meet the requirements.


2. Follow the steps below when assembling the finished product


Warehouse → production line → production line upgrade software → assemble into a complete machine → QC test → write IMEI number → QA full inspection → restore factory settings → storage; software must be upgraded before assembly. Due to improper welding, short circuit, operation process problems, etc., it cannot be upgraded, resulting in misjudgment of poor PCBA.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.65874.cn

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號(hào)
  • Links:
主站蜘蛛池模板: 天天夜夜啦啦啦| jj视频免费| 日本漫画被黄漫免费动| 搞逼综合网| 亚洲成人91| 国产草草视频| a级黄色视屏| 欧美国产在线视频| 秀逼逼| 国产91青青成人a在线| 亚洲精品一区二区久久这里| 亚洲国产精品综合久久一线| 国产成年人网站| 黄网国产| 亚洲精品乱码久久久久久蜜桃图片| 九草视频在线| 好大好猛好爽好深视频免费| 日日爽日日操| 美女18隐私羞羞视频网站| 国产成人精品在线观看| 国产欧美久久一区二区| 欧美性4khd720| 三极片在线观看| 激情视频激情小说| 久久伊人久久| 黄a一级| 亚洲福利二区| 日本美女动态图片| 毛片免费全部免费观看| 国产在线播放91| 插入粉嫩| www免费插插视频| 18欧美同性videos可播放| 日本暖暖在线视频| 日本无遮挡拍拍拍凤凰| 欧美一级激情| 国产精品久久99| 国语刺激对白勾搭视频在线观看| porono日本人xxx| 第一次破苞h| 欧美性白人顶级hd|