看天堂-看特级毛片-看特级大黄一片-看全色黄一级毛片-看全色黄大色黄女视频-看全色黄大色黄大片视频

Welcome to the official website of Shenzhen Ledfocus Precision Manufacturing Co., Ltd.!
News
News
Hot products

Service Hotline

0755-29727486 0755-83734215 0755-83734236
FAQ

Where are you now:Home >> News >> FAQ
What exceptions will occur during SMT production? Normally
Time:2021-10-08 Read: 2098

1. Ideal solder joints

It has good surface wettability, that is, the molten solder should spread on the surface of the welded metal and form a complete, uniform and continuous solder covering layer, and its contact angle should not be greater than 90


The correct amount of solder, the amount of solder is sufficient but not too much or too little

For a good welding surface, the surface of the solder joint should be complete, continuous and smooth, but it does not require a very bright appearance.

Good solder joint position The position deviation of the solder end or pin of the component on the pad is within the specified range.


2. No wetting

The contact angle formed by the solder on the solder joint and the surface of the welded metal is greater than 90


3. Open welding

The pad is separated from the PCB surface after soldering.


4. Suspension bridge (drawbridging)

One end of the component leaves the pad and faces the bag upright diagonally or upright


5. Bridging

The solder between two or more solder joints that should not be connected is connected, or the solder joints of the solder joints are connected with adjacent wires.


6. Welding

After soldering, electrical isolation sometimes occurs between the solder end or the pin and the pad


7. Draw the tip

There are solder burrs protruding outward in the solder joints, but they are not in contact with other conductors or solder joints


8. Solder ball

A small ball of solder that adheres to the printed board, the solder mask or the conductor during soldering.


9. Holes

Holes with different apertures appear in the weld


10. Position offset (skewing)

When the solder joint deviates from the predetermined position in the horizontal, vertical or rotational direction in the plane.


11. Visual inspection

With the aid of a magnifying glass of 2~5 times of the illumination, inspect the quality of PCBA solder joints with naked eyes


12. Inspection after aoldering

Quality inspection after PCB is soldered.


13. Reworking

Repair process to eliminate local defects of surface mount components.


14. Placement inspection

When surface mount components are mounted or after they are mounted, quality inspection is carried out for any missing, misplaced, mis-mounted, damaged, etc. conditions.


In SMT inspection, two methods, visual inspection and optical equipment inspection, are often used. Some only use the visual inspection method, and there are also two mixed methods. They can all inspect the product, but if the visual inspection method is used, people will always get tired, so there is no guarantee that employees will conduct a careful inspection. Therefore, we need to establish a balanced inspection and monitoring (monitering) strategy that is to establish quality process control points.


In order to ensure the normal operation of SMT equipment, strengthen the quality inspection of the processed workpieces in each process, so as to monitor its operating status, and establish quality control points after some key processes. These control points are usually established in the following locations:


1) PCB inspection

a. Whether the printed board is deformed; b. Whether the pad is oxidized; c. Whether the surface of the printed board is scratched;

Inspection method: visual inspection according to inspection standards.


2) Silk screen inspection

a. Is the printing complete; b. Is there any bridging; c. Is the thickness uniform; d. Is there any sag; e. Is there any deviation in the printing;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


3) Patch inspection

a. The placement position of the component; b. Whether there is a chip; c. whether there is a wrong part;

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.


4) Reflow soldering inspection

a. The soldering condition of the component, whether there are bad soldering phenomena such as bridging, tombstones, dislocation, solder balls, virtual soldering, etc. b. Soldering joints.

Inspection method: visual inspection according to inspection standards or inspection with magnifying glass.

Contact Us
Shenzhen Ledfocus Precision Manufacturing Co., Ltd.

Address: Room 1204, Dahong (Xinqiao) Science and Technology Innovation Park, No. 48, Xinyu Road, Shajing Street, Baoan District, Shenzhen

Phone: 0755-29727486 0755-83734215 0755-83734236

Person in charge: Mr. Fan 13088821718

Email: roman@leikashi.com

Business section #605

Email: allen@leikashi.com

Website: www.65874.cn

Service hotline
0755-83734236
? 2020 Shenzhen Ledfocus Precision Manufacturing Co., Ltd. All rights reserved 粵ICP備2021139374號
  • Links:
主站蜘蛛池模板: 99精品国产美女福到在线不卡 | 91se在线| 日韩精品一区二区三区中文在线 | 1986葫芦兄弟全集免费观看第十集 | 亚洲狠狠婷婷综合久久久久网站 | 亚洲激情视频在线 | 国产免费福利片 | 办公室恋情在线 | 午夜国产小视频 | haodiaocao几万部精彩视频 | 疯狂伦交1一6 小说 风间由美在线 | 女子校生下媚药在线观看 | 亚洲spank男男实践网站 | 精品国产一区二区三区在线 | 五月一区二区久久综合天堂 | 香蕉eeww99国产精选播放 | 欧美精品一国产成人性影视 | 欧美人禽杂交在线视频 | 欧美香蕉人人人人人人爱 | 美女脱一光二净的视频 | 饭冈加奈子在线播放观看 | 国产另类视频一区二区三区 | 欧美黑人性 | 午夜国产福利视频一区 | 日本老妇乱子伦中文视频 | 亚洲精品一区在线观看 | 天天有好逼 | 国内精品久久久久久中文字幕 | bbc japanese黑人强行 | 99自拍视频在线观看 | 国产女乱淫真高清免费视频 | 免费国产在线视频 | 亚洲精品乱码久久久久久蜜桃欧美 | 精品国产人成亚洲区 | 视频一区国产精戏刘婷30 | 日本动漫黄网站在线观看 | 国产好痛疼轻点好爽的视频 | 欧美free激情野战hd | 国产精品免费小视频 | 人阁色第四影院在线观看 | 国内精品免费一区二区三区 |